- Subject: meter 1558 april 2001
- cerrito lastiendas - has meter flow on the 7 th and the deal ended on the 6 th . can we extend the deal for the 48 mmbtu ' s that flowed
- or can i override the meter and add it to a day that flowed less than the nom ? the third had 4861 and the nom was for 5000 .
- thanks - julie
|