123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687 |
- Subject: re : basin production from ga 213
- bob ,
- as mentioned earlier , houston exploration is also delivering gas to us at
- this meter . the following production is now on - line and a ticket should be
- created and entered into sitara based on the following :
- counterparty meter volumes price period
- houston exploration 9696 8000 mmbtu / d 100 % gd less $ 0 . 16 2 / 1 - 2 / 28
- fyi , i will create and submit a committed reserves firm ticket if and when
- the gas buyer terms the deal up . additionally , this is a producer svcs . deal
- and should be tracked in the im wellhead portfolio . . . attached to the
- gathering contract .
- thanks ,
- vlt
- x 3 - 6353
- - - - - - - - - - - - - - - - - - - - - - - forwarded by vance l taylor / hou / ect on 02 / 09 / 2001
- 02 : 46 pm - - - - - - - - - - - - - - - - - - - - - - - - - - -
- enron north america corp .
- from : robert cotten 01 / 26 / 2001 08 : 47 am
- to : daren j farmer / hou / ect @ ect
- cc : vance l taylor / hou / ect @ ect
- subject : re : basin production from ga 213
- daren / vance ,
- deal # 586954 has been created and entered in sitara :
- date meter # volume price
- 2 / 1 / 01 - 2 / 28 / 01 9696 5 , 000 100 % gas daily less $ 0 . 16
- bob
- daren j farmer
- 01 / 26 / 2001 08 : 25 am
- to : robert cotten / hou / ect @ ect
- cc :
- subject : re : basin production from ga 213
- - - - - - - - - - - - - - - - - - - - - - - forwarded by daren j farmer / hou / ect on 01 / 26 / 2001
- 08 : 24 am - - - - - - - - - - - - - - - - - - - - - - - - - - -
- vance l taylor
- 01 / 25 / 2001 01 : 58 pm
- to : daren j farmer / hou / ect @ ect
- cc : john peyton / hou / ect @ ect
- subject : re : basin production from ga 213
- daren ,
- i ' ve just received word from basin to bring production on sometime today or
- tomorrow ( they expect to get up to b / t 10 , 000 - 15 , 000 d ) ; if our facility
- planning engineer determines that we can take the gas , then it will flow for
- all of february and be priced at 100 % gas daily less $ 0 . 16 .
- vlt
- daren j farmer
- 01 / 25 / 2001 01 : 47 pm
- to : vance l taylor / hou / ect @ ect
- cc :
- subject : re : basin production from ga 213
- i need for you , or the producer services group , to determine if you think the
- gas will flow for the month and at what price . i will use your decision for
- our bidweek postion .
- d
- vance l taylor
- 01 / 25 / 2001 11 : 53 am
- to : daren j farmer / hou / ect @ ect , robert cotten / hou / ect @ ect
- cc : susan smith / hou / ect @ ect , melissa graves / hou / ect @ ect
- subject : basin production from ga 213
- fyi ,
- how would you want to handle for february nomination ?
- vlt
- x 3 - 6353
- - - - - - - - - - - - - - - - - - - - - - - forwarded by vance l taylor / hou / ect on 01 / 25 / 2001
- 11 : 55 am - - - - - - - - - - - - - - - - - - - - - - - - - - -
- enron north america corp .
- from : brad blevins 01 / 25 / 2001 10 : 56 am
- to : john peyton / hou / ect @ ect
- cc : nick cocavessis / corp / enron @ enron , steve - hpl - schneider / hou / ect @ ect , pat
- flavin / gco / enron @ enron , vance l taylor / hou / ect @ ect , buck
- thomas / gco / enron @ enron
- subject : basin production from ga 213
- i have reviewed the gas composition analysis from spl of the basin production
- from ga 213 . while spl ' s analysis does show a dewpoint of around 20 degrees
- f at 400 psig , it is both my and john handley ' s opinion that the gas from the
- wellbore had stratified by the time that this sample was taken . we expect
- the dewpoint of the flowing gas to be higher . however , this was the best
- sample that could be obtained at the time . we have conferred with steve
- schneider and we are willing to take this gas on a conditional basis over the
- next couple of days . once the 6 " line has been pigged , the production flows
- stablilized and mitchell ' s conditioning equipment lined out over the next
- couple of days , hms will need to take another sample at the meter run and
- have spl run an extended analysis with a dewpoint curve on an expedited
- basis . should this sample indicate a dewpoint over 45 degrees f , then this
- production will be shut in again until hydrocarbon dewpoint conditioning
- equipment has been installed . in the meantime , hms needs to keep a close
- watch on all southern union city gates on galveston island to monitor for
- liquids fallout .
|