3389.2001-01-22.farmer.ham.txt 1.8 KB

123456789101112131415161718192021222324252627
  1. Subject: weekend oncall notes
  2. friday 1 / 19 / 01 - received a call from sheila at basin regarding a well which
  3. may be coming on this weekend ( meter 9696 ) . phone lee in gas control
  4. regarding same . lee informed me that hpl would prefer that the volumes are
  5. not brought on until a field tech can pull a sample and verify that there are
  6. no liquids involved . lee further informed me that the same day to tejas at
  7. hardy was not in the system , and , per gary hanks , needed to be corrected .
  8. lee informed me that the volumes were actually split 10 m at hardy / tejas and
  9. 10 m at lomax . i went into sitara and updated the deal ticket , pathed and
  10. nominated over to pops .
  11. saturday 1 / 20 / 01 - 8 : 30 am sean paged regarding the nomination at dow
  12. freeport , he was questioning the validity , as we do not often flow at this
  13. meter . i checked and the nomination was good for saturday ' s gas day . sean
  14. informed me that the valero refinery was up and down and would be going
  15. completely down on sunday .
  16. 10 : 00 am - sean called regarding tejas laporte , meter 665 . apparently , the
  17. meter had a confirmed volume of 20 m and hpl / ena had no deal at the meter .
  18. checked in pops and discovered that the deal was confirmed at 20 m on a deal
  19. volume of zero . informed sean that the tejas volume was confirmed . also ,
  20. per sean koch george west ( meter 6722 ) had a nomination increase of 10 m ,
  21. which he wanted to confirm .
  22. sunday 1 / 21 / 01 10 : 00 am sean paged regarding the dow meter 1442 , pops still
  23. showed a confirmed voume of 10 m which dow and oasis showed at zero for
  24. sunday . i checked the system and confirmed that the meter was indeed at
  25. zero and phoned sean back to confirm . checked on mtp hardy , sean informed me
  26. that we came in on rate for saturday and that current meter activity looked
  27. good .