  1. Subject: re : deer park railroad crossing 18 " 3026 line
  2. the following meters are in the affected section for the outage planned in
  3. april :
  4. 980713 georgia gulf
  5. 981052 phillips pasadena
  6. 981188 albemarle
  7. 981418 air products pasadena
  8. 988014 crown refinery
  9. 981061 shell west station
  10. 982034 crown st . city gate
  11. the only meters we are flowing at for march are the two listed in the memo
  12. below ( 1188 albemarle , 1418 air products pasadena ) . we will not be able to
  13. feed these from hpl during the outage .
  14. i will update you as things change .
  15. thanks
  16. gary
  17. - - - - - - - - - - - - - - - - - - - - - - forwarded by gary a hanks / hou / ect on 03 / 27 / 2000 03 : 27
  18. pm - - - - - - - - - - - - - - - - - - - - - - - - - - -
  19. william d cosby @ enron
  20. 03 / 24 / 2000 02 : 39 pm
  21. sent by : william d cosby @ enron
  22. to : gary a hanks / hou / ect @ ect
  23. cc :
  24. subject : re : deer park railroad crossing 18 " 3026 line
  25. gary , mainline valves to be closed on the 18 " 3026 line are as follows :
  26. u - 5 at crown street and u - 6 at the end of the line where ship channel loop
  27. 3026 line ties into the shell west 4792 line .
  28. it is my understanding that the following customers within this outage
  29. section currently take gas :
  30. air products meter 1418
  31. albemarle meter 1188
  32. the current schedule would call for an outage to start on 4 / 13 / 00 and be back
  33. in service on 4 / 16 / 00 .
  34. from : gary a hanks @ ect 03 / 20 / 2000 10 : 36 am
  35. to : william d cosby / gco / enron @ enron
  36. cc :
  37. subject : deer park railroad crossing 18 " 3026 line
  38. which mainline valves will be closed during the work and can you send me a
  39. list of the meters in the affected section ? i need to get with the texas
  40. desk prior to their pre - bid meeting which is this friday , march 24 .
  41. based on the changes , it still appears to me the work is planned for the last
  42. week in april . as a date becomes firm please let me know .
  43. thanks
  44. gary
  45. - - - - - - - - - - - - - - - - - - - - - - forwarded by gary a hanks / hou / ect on 03 / 20 / 2000 10 : 30
  46. am - - - - - - - - - - - - - - - - - - - - - - - - - - -
  47. william d cosby @ enron
  48. 03 / 16 / 2000 10 : 28 am
  49. sent by : william d cosby @ enron
  50. to : gary a hanks / hou / ect @ ect
  51. cc : team hpl - pearland / gco / enron @ enron , buck thomas / gco / enron @ enron , sam
  52. shaw / gco / enron @ enron , pat flavin / gco / enron @ enron , nick
  53. cocavessis / corp / enron @ enron , steve schneider / hou / ect @ ect , kevin
  54. kuehler / corp / enron @ enron , calvin dodd / gco / enron @ enron , charlie
  55. thompson / gco / enron @ enron , ann elizabeth white / hou / ect @ ect , james
  56. mckay / hou / ect @ ect , don thomas / gco / enron @ enron
  57. subject : deer park railroad crossing 18 " 3026 line
  58. the pipeline outage time mentioned in the memo below needs to be revised .
  59. actual construction time should be 7 days and pipeline outage time should be
  60. 3 days max . this outage time , which is longer than the norm , is due to the
  61. fact that we will have to remove the existing line and replace it in the same
  62. ditch before tie ins take place .
  63. as an update , the first train is now scheduled to cross late today . they now
  64. say that it may take 4 weeks to get all the trains in and out before we are
  65. able to begin replacing our line .
  66. - - - - - - - - - - - - - - -
  67. i have been advised by the deer park rr representative , dean truitt , that
  68. the rail cars will begin arriving on 3 / 15 / 00 .
  69. per our conversations today , please have someone on tuesday 3 / 13 adjust the
  70. regulators at simpson and at shell deer park so that 280 psig is the maximum
  71. pressure in that pipeline section .
  72. i will maintain contact with deer park on the duration of this project and
  73. keep you informed . it is likely that the duration of the pressure reduction
  74. will be on the order of 2 weeks .
  75. after the initial 700 rail cars have entered and exited their facility , deer
  76. park will remove their railroad bed and allow us to perform a pipeline
  77. replacement at that location . this replacement would involve an outage on
  78. this segment of pipeline for approximately 7 days . i would anticipate that
  79. this outage would occur in early april .